Hi,

 

1.     I General output materials'll have should under go QC plans. In your case Ring is consumable and Segments are the yield. So inspection lot is to be maintained for segments (DUMP-RULE).

 

2.     If materials segments are rejected for e.g., out-off 16 segements 2 where rejected during inspection then u'll have a short-fall by 2 nos.

 

To Replace Reject Component do as follow:


SOLUTION 1:

 

Unplanned Goods Issue:-

 

With this type of withdrawal, it is determined during the production process that an additional material or an additional quantity of a component already withdrawn is required for an order. This withdrawal is unplanned because there is no reservation to be referenced. You enter this withdrawal as a goods issue without reference.

 

Entering Goods Issue Without Reference (Unplanned Goods Issue): -

 

Entering a goods receipt without referencing a document involves the following steps:

 

1. MIGO - Goods Issue > Others (Here use movement type "261")

2. Enter all details like; material, qty, plant, storage location, etc... IN YOUR CASE THIS IS RING.

3. In "Account Assignment" Tab enter "Production Order No"

 

Note: - If U select Goods Issue > Order and enter Order No and system defaults the materials and qty then its planned.

 

SOLUTION 2:


Production Order Without Material (CO07):


Here in settlement rule define you PREVIOUS PRODUCTION ORDER.

 

BOM add manually as i explained for main Prod Order.

 

The rest normal.

 

Expecting you feedback.

 

Thanks With Regards,