Hi Sarat
In the planning package, enter start period as, say, 001.2009.
In the planning layout, remove the char "PERIO", from general data selection.
In the column for the Value field "Sales qty", include the char PERIO and enter variable as "1". This variable will be supplied with the value from Planing package. Copy the column and change the variable as 1+1, 1+2, etc
To Apply Std cost, you need to set up COPA Valuation for Point of Valuation 03 and 04 ( Same as 01)
To apply Sales Price from Condition Records, again you will need COPA Valuation Customizing. In KE4U. specify Application as V and Specify SD Pricing Procedure in the "Costing Sheet" Column
After all this, once you load Sales Plan Qty, run the Valuation Step in KEPM. It will valuate the Sales Qty with Std cost and ASP
Ajay M