As we know SAP BPC for S/4 HANA will use the embedded BPC to do the planning now,Anybody know the availability time frame for consolidation with embedded BPC?
Thanks.
As we know SAP BPC for S/4 HANA will use the embedded BPC to do the planning now,Anybody know the availability time frame for consolidation with embedded BPC?
Thanks.