Not so much a system error but a process one.
When I process the material staging in MF60 a material document is created and the stock is immediately from (Plant/Sloc/Warehouse/Storage type/Storage bin) 1000/0001/W01/WA/bin1 to 1000/0011/W01/bin1.
The movement type in the mat doc is 311. I am expecting a TR to be created following the MF60 staging so that I can pick from warehouse W01 and then on delivery to the 0011 PSA SLoc I confirm it in to a PSA bin in storage type 100.
I understand that Sloc to Sloc will create a PCN but I was under the impression that as I have set up a separate SLoc for production I had to link to current warehouse so that I can create Production supply bins where I would locate the production stock (as defined in the control cycle)
Do I need to define a new movement type? A copy of 319? As I'm sure I'm missing the movement type link somewhere.